Reference - steel structures
In the six-story building, we, along with the construction company, reinforced the vertical structures and the ceilings above the individual floors. The total consumption of steel rolled profiles was 140 tons. We transported this volume of material to the building while operations were in full swing on Jindřišská and Panská streets.
Other locksmith constructions:
Realization 06/2011 - 10/2013.
+420 731 141 141